Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Engineering Study for the Development of Solar Power System
Reference: MTC-16/2020  6/7/2020, Location: Africa
Category: Engineering

Scope of Work
The company announces its need for Engineering Study For the Development of Solar Power System for some of AGOCO Oil Field Project no Q-15.

The scope of work shall consist mainly of site visit/inspection for data gathering, engineering study, detailed engineering, preparation of drawings and documents, and other related services for the Engineering Study for the Development of Solar Power System for Some of AGOCO Oil Fields namely in the following:
- Gathering Center No. 3 (GC-3) in Sarir Oil Field.
- VV-Area in Messla Oil Field.
- Majid Oil Field, including UU-Area.
- Sultan Oil Field NC-129.
- Senawn Oil Field NC-100.

The scope of work shall include the engineering study for the new installation of solar power system and new installation and/or extension of required transmission and distribution system, including substation/s, as maybe required, to distribute the new and/or increase in available power supply.





Related Prooducts: Engineering Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Tenders: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Energean Selects Halliburton for Offshore Israel Drilling Campaign
Halliburton Introduces iStar Intelligent Drilling and Logging Platform
Halliburton & VoltaGrid enter a Contract with Aethon for Electric Fracturing
Halliburton Announces Third Quarter 2021 Results
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us