Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Replacement and Supply New of Two Desalters at GC-1
Reference: MTC-15/2020  6/7/2020, Location: Africa
Category: Desalination Plant

Scope of Work
The company announces its need for Replacement and supply new of two Desalters at GC-1, Sarir oil field project No: P-24.

The contractor shall perform site survey to collect and verify the necessary data, information and suggestion from the company and shall produce the Engineering package based on its own survey result/ data collection and calculation.

The contractor shall dismantle/ remove Desalter 1 and 2 shall transfer to the company designated storage area.

The contractor shall dismantle/ remove existing foundation and design and construct the new foundation as per applicable codes and standards.

The contractor shall install the new Desalters and shall align with the existing facilities.

The contractor shall establish all tie-ins and connect points to existing facilities.

All sample points, sight glass gauges, drains or any instrument drains shall be connected to the drain pit.





Related Prooducts: Desalination Plant General  RO Membrane 

Related Tenders: General  RO Membrane 

GEA Supports Shipping Industry as System Supplier in Solutions for the Fuels of the Future
Kraton Corporation Enters Into Agreement To Be Acquired By DL Chemical Co., Ltd.
Flux Power Announces Closing of $15M Registered Direct Offering Priced at a Premium to Market
Sunnova Partners with AutoGrid to Help Modernize California’s Power Grid
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us