Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Laying and Associated Works for KG Basin - Part A
Reference: 8000015940 6/9/2020, Location: Asia
Category: Pipe Lines Installations

Scope of Work
The company announces its need for Laying and Associated works for KG Basin - Part A.

The scope of this part comprises all engineering and design / construction related activities, Procurement, Fabrication, Construction, Installation & Testing, Pre-commissioning and commissioning of the proposed replacement Pipelines and associated Station facilities, and new Piping and installations at Terminals/SV Stations, including Piping/Pipeline hook-up, TCP, Instrumentation & Control, civil and electrical works. Complete scope of work is divided into two parts.

Part -1: Pipeline replacement of Mortha-Tadepalli Pipeline (18” diameter x App. 23.5 KM) The proposed new 18” NB pipeline will be laid in existing ROU of GAIL, adjacent to the existing 18” NB Pipeline.

Part-2: Pipeline replacement of Kottipali-K-Cheruvu Pipeline (18” diameter x App. 10 KM) & Tatipaka terminal work.
The proposed new 18” NB pipeline will be laid in existing ROU of GAIL, between existing 18” NB and 24” NB Pipelines of GAIL. 18” NB abandoned (dead) pipeline, which is laid between 18” and 24” Pipelines is to be removed. After its removal, the proposed new 18” Pipeline shall be laid in the same trench cleared by removal of the dead pipeline. Scope also include taking delivery of free items from Owner’s stores, transportation to site, storage, installation, testing & commissioning etc. Bidders have option to quote for Part 1 or Part 2 or both parts.



Related Prooducts: Pipe Lines Installations Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Tenders: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Hoegh LNG Partners LP Announces Transition of Senior Leadership
Dr. Nikolas P. Tsakos Inducted into the International Maritime Hall of Fame in New York
Stena and Global Energy Storage Announce LNG Cooperation
GES Appoints Former Puma Energy Chairman, Graham Sharp, as Non-Executive Director

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us