EPC of De-Bottleneck Gas Distribution Network Phase1
Reference: TP-608-2020 / CO-496-2020 6/14/2020, Location: Middle East
Category: Engineering Procurement and Construction (EPC)
Scope of Work
The company announces its need for Engineering, Procurement and Construction of De-Bottleneck Gas Distribution Network Phase1.
To construct pipelines of ˜ 6.1 KM length route from Hidd Metering Station (HMS) to Wharf Valve Station (WVS). Major of the pipelines will pass through the sea and the rest of the portion shall be buried while approaching HMS and WVS.
|