Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Provision of Modification & Installation Service for WS2 Water Purification Skid
Reference: 065/SC/19 RE 7/21/2020, Location: Middle East
Category: Water treatment Plant

Scope of Work
The company announces its need for Modification and Installation Service for WS2 Water Purification Skid.

1.1. Divide the existing water purification skid into parts and relocate them in two containers.
1.2. Install the equipment and pipelines, layout reasonable.
1.3. Supply stainless steel pipe and fittings, fabricate equipment base, and pump base and piping support.

2.1. Rust removal and paint internal of water tank and sedimentation tank.
2.2. Repair welding of leakage for the two fitter tanks,process outside surface of the tank with fiberglass ribbon epoxy glue.
2.3. Overhaul the water pump, booster pump and dosing pump.
2.4. Maintain and test PLC system & electrical system.

3.1. Remove external piping and electrical instrument connection cables, etc.
3.2. Transport the three containers to WS2
3.3. Foundation construction.
3.4. Install equipment and pipeline, electric connection.
3.5. System pressure test, commissioning, operation.

4.1.Supply chemical, filter material, filter elements



Related Prooducts: Water treatment Plant General 

Related Tenders: General 

Decarbonization Project Using Hydrogen at Immingham Port in the U.K. Starts
Standard Solar Funds Rooftop Solar Arrays to Further Reduce Environmental Impact
Stem Highlights Significant Milestones
Charlene A. Thomas Named to ALLETE Board of Directors
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us