Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

NC118 Development Project Feasibility Techno-Economic Study
Reference:  PRQ/777/GP/20 8/27/2020, Location: Africa
Category: Engineering

Scope of Work
The company announces its need for NC118 Development Project Feasibility Techno-Economic Study.

The scope of work is to perform the feasibility (Techno-Economic) study for the development of NC118, the required work shall include but not limited to the following options:-
1- To develop Stand-alone EPF (Early Production Facilities) connected to the existing Wafa-Mellitah Liquids P/L.
2- Synergy with Nafusah Oil Operations in Area 47 which is need to be studied and evaluated.

Contractor who will provide comparative economics analyses details of each option such as discounted cash flow analyses and shall produce relevant economic indicators.



Related Prooducts: Engineering Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Tenders: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Talos Energy Provides 2rd Quarter Operational & Financial Update
Talos Energy & Freeport LNG to Develop Carbon Capture Project on Texas
Talos Energy Announced as High Bidder on 57,600 Deepwater Acres
Talos Energy Announces Pricing Public Offering of Common Stock
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us