Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Preparing, Setting up, Operating and Calibrating Bridge Scale
Reference: 2020/2121 9/21/2020, Location: Middle East
Category: Calibration Equipment

Scope of Work
The company announces its need for Preparing, setting up, operating and calibrating a bridge scale for the weight of the ponds in the form of fat.


Related Prooducts: Calibration Equipment Analyzers, Gas  Calibration Equipment  Calibrators, Electronic, Pneumatic  Concentration  Conductivity Meters  Density  Detector, Gas  Dissolved Oxygen meters  Drilling Instruments  Float Switch  Gas meters  General  Indicators and Recorders  Leak Locators  Level meters  Liquid Measurement  Load cells  Monitoring & Control  Mud Control  Mud Logging  pH and REDOX  Pressure gauges/ Transmitters  Radiation Detection  SCADA Systems  Temperature gauges/ Transmitters  Thermocouples  Thermowells  Transducers  Transmitters  Transmitters, Pressure  Turbidity Meters  Viscosity  Weather Station  Weighing Equipment 

Related Tenders: Analyzers, Gas  Calibration Equipment  Calibrators, Electronic, Pneumatic  Conductivity Meters  Density  Detector, Gas  Dissolved Oxygen meters  Drilling Instruments  Gas meters  General  Indicators and Recorders  Leak Locators  Level meters  Liquid Measurement  Monitoring & Control  Mud Logging  Pressure gauges/ Transmitters  SCADA Systems  Temperature gauges/ Transmitters  Thermocouples  Thermowells  Transmitters  Transmitters, Pressure  Viscosity  Weather Station 

GTT Obtains Tank Design Order for New LNG Carrier from DSME
€240M in Revenue for the First Nine Months of 2021, in Line with Expectations
GTT Selected by HSHI to Design Cryogenic Fuel Tanks of 2 LNG-Fueled Vessels
GTT Obtains Tank Design Order for New LNG Carrier from DSME
Oil Treating & Refining

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us