Complete New Air Cooler Steam Condense System
Reference: 576/2020/E  10/18/2020, Location: Middle East
Category: Instruments

Scope of Work
The company announces its need for Complete New Air Cooler Steam Condense System with all Accessories Capacity 60 ton/h.

This specification is intended to cover the design, engineering, manufacture, Assembly / pre-assembly, tests at manufacturer’s works, insulation work, shop painting , delivery properly packed for transport, complete erection, final check-up, testing at site, successful commissioning, conducting performance and acceptance tests at site of Complete New Air Cooler Steam Condenser
System Unit 60 ton\h capacity with all accessories.

THE Unit should include Complete New Air Cooler Steam Condenser System to take 60 ton\h of Low Pressure Steam @(5.5 bar g & 300 C°) from S.R.C Low Pressure Steam Network and convert it to Low Condensate @ (95C°) at battery limit, the conceptual diagram for unit attached in diagram (1) . this work must include all necessary equipment as piping , steam reduction station, Steam air cooler, tanks, pumps, valves, controls ,safety equipment's, spare part …. etc.

Scope of Process Works :
1. The Contractor should do site survey before preparing the tender
2. Supply and install Unit total capacity (60 ton\h) as two line (30 ton\h) for each one furnished with all necessary equipment and accessories.
3. Unit fed with Low Pressure Steam @(5.5 bar g & 300 C°) from existing Low Pressure Steam Network.
4. Supply and install two skid mounted steam reduction station with capacity (30 ton/h) each one with all necessary equipment and accessories.
5. Supply and install two set of skid mounted air cooler steam condensers Horizontal type with capacity (30 ton/h) each one with all necessary
equipment and accessories.
6. Supply and install condensate accumulated tank with capacity 15 m3 furnished with all necessary equipment and accessories.
7. Supply and install skid mounted of three condensate transfer pumps with capacity 45 m3/h each one furnished with all necessary equipment and accessories.
8. Supply and install all piping, valves, connections, supports, steel structure , …etc.
9. Supply and install Complete structural framework ( columns, beams & bracings), partition beams, beams for supporting fan & drive assembly, air seals, supporting arrangement for electrical cables, stairs, ladders, walkways, gratings, handrails, roofing, plenum chamber, fan & pulley
guards etc.
10. Supply and install safety relief valves for each stage of pressure points. Relief vent piping must be piped to exterior.
11. Supply all documents such as operation manuals, diagrams and drawings as 4 copies (2 soft , 2 paper).
12. Supply and install safety equipment's.
13. Pre-commission , Commission , site training and test run for 72 hour .



Related Prooducts: Instruments Analyzers, Gas  Calibration Equipment  Calibrators, Electronic, Pneumatic  Concentration  Conductivity Meters  Density  Detector, Gas  Dissolved Oxygen meters  Drilling Instruments  Float Switch  Gas meters  General  Indicators and Recorders  Leak Locators  Level meters  Liquid Measurement  Load cells  Monitoring & Control  Mud Control  Mud Logging  pH and REDOX  Pressure gauges/ Transmitters  Radiation Detection  SCADA Systems  Temperature gauges/ Transmitters  Thermocouples  Thermowells  Transducers  Transmitters  Transmitters, Pressure  Turbidity Meters  Viscosity  Weather Station  Weighing Equipment 

Related Tenders: Analyzers, Gas  Calibration Equipment  Calibrators, Electronic, Pneumatic  Conductivity Meters  Density  Detector, Gas  Dissolved Oxygen meters  Drilling Instruments  Gas meters  General  Indicators and Recorders  Leak Locators  Level meters  Liquid Measurement  Monitoring & Control  Mud Logging  Pressure gauges/ Transmitters  SCADA Systems  Temperature gauges/ Transmitters  Thermocouples  Thermowells  Transmitters  Transmitters, Pressure  Viscosity  Weather Station 

JERA to Invest in Freeport LNG Development to Secure a Stable LNG Supply
Saab Seaeye's New Underwater Robot to Join Ocean Infinity's Armada
At COP26, 11 National and Subnational Governments Launch The Beyond Oil & Gas Alliance
ANP Qualifies Petrobras and Shell for the 2nd Round of the Transfer of Rights

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us