Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Provision of 3-1/2" Tubing and Pipe Joint
Reference: 031/PC/20 1/18/2021, Location: Middle East
Category: Pipe, Casing & Tubing

Scope of Work
The company announces its need for Provision of 3-1/2" Tubing and Pipe Joint.

- Item001, QTY=150,000m of 3-1/2"80SS, EUE tubing (wall thick 6.45mm, weight9.3ppf, length9.5-10m), API, TM0177-2005 Method A in Solution A.
- Item002, QTY=75EA of 0.4-0.6m,3-1/2"tubingSub, 80SS, EUE, 6.45mm, 9.3ppf, Pin*Pin3-1/2".
- Item003, QTY=50EA of 3-1/2"shorttubing, 80SS, EUE, 6.45mm, 9.3ppf, Pin*Box, length, 2.2m.
- Item004, QTY=50EA of 3-1/2"shorttubing, 80SS, EUE, 6.45mm, 9.3ppf, Pin*Box, length, 1.2m.



Related Prooducts: Pipe, Casing & Tubing Anchors  CPVC Pipes  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Pipeline Heating Equipment  Piping Accessories  Plastic Pipes  PP Pipes  PTFE Rods  PVC Pipes  PVDF Pipes  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

Related Tenders: Anchors  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Piping Accessories  PTFE Rods  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

MOP Resolute to Develop Joint Fields
$11b Investment Necessary for Iran Offshore Gas Fields
$4b Compulsory to Recover 100mcm/d Gas from North Pars
Iran Begins Appraisal of Areas Outside South Pars Phases for Hydrocarbons
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us