Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Mechanical Flow Line Tie-in of Wells No.L96
Reference: MTC-08/2021  3/2/2021, Location: Africa
Category: Workover & Well Services

Scope of Work
The company announces its need for Mechanical flow line Tie-in of wells No.L96 at Sarir Field and well No.C74 & Z12 at Beda Field.

SOW Description:
The objective of the project is to supply and installation of tie-in of the following wells:
- Well No. (L96-65) to be tie-in as sharing well with Well No. L60-65 connected to GC-4 manifold at Sarir Field approx. distance of 900 meters.
- Well No. (Z12-47) to be tie-in to the available free slot at Dor Mansour Station manifold Beda Field approx. distance of 1500 meters.
- Well No. (C74-47) to be tie-in to the available free slot at Kotla Station manifold Beda Field approx. distance of 800 meters.



Related Prooducts: Workover & Well Services Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Tenders: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Status Update of Alameda-1 Drilling Operations
Approval Received for Transfer of WA-488-P
Completion of Sale of WA-488-P
Melbana Energy Provides Cuban Drilling Operations
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us