Provision of EPCC of Upgrade Electricity Network
Reference: HFY-CON/PR1134-1157 6/28/2021, Location: Middle East
Category: Engineering Procurement and Construction (EPC)
Scope of Work
The company announces its need for Provision of Engineering, Procurement, Construction and Commissioning (EPCC) of Upgrade Electricity Network for the Vehicles Inside Halfaya Contract Area.
(1) New built 11kV OHTL & 0.4KV OHTL, with all accessories. (2) 630A, 12KV, SF6, On-load dis-connector switch for tie-in point. (3) 11/0.4Kv, 250KVA Distribution Transformer, H-pole mounted with 2 LV protection panel (pole mounted) for each transformer, with all accessories. (4) 11 kV Lightning arresters & 11kV Link fuse with element fuse 20A. (5) MV and LV Cables and cabling. (6) Dismantle existing OHTL materials/equipment and return it to the warehouse of the Missan electric Office. (7) Earthing system, Civil/structure works & Survey work. (8) Site preliminaries, mobilization, office facilities at work site, site camp as per contract and demobilization. (9) Detail design, survey, materials procurement, construction and installation, commissioning, as-built document, final documentation and one-year warranty.
|