Design, Procurement, Fabrication, Testing & Start-up of off Plot Infrastructure for ABWTF
Reference: TP-771-2021 7/27/2021, Location: Middle East
Category: Oil and Gas Pipeline
Scope of Work
The company announces its need for the design, procurement, fabrication, installation, testing, pre-commissioning, commissioning and start-up of off plot infrastructure for ABWTF. As part of this project, network expansion is required to transport produced water from pipelines to the location of ABWTF. Scope also includes necessary off-plot pipelines to receive recovered oil back to the facility from ABWTF recovered oil collection tank and pumps.
|