Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of 3 inch Pipe _CVR Phase 5 Project
Reference: TPC-1594-2022 2/21/2022, Location: Middle East
Category: Pipes

Scope of Work
The company announces its need for Supply of 3 inch Pipe _CVR Phase 5 Project. Additional wells are planned to be hooked up to the CVR system in 2022 , the required piping materials will be procured under this tender.





Related Prooducts: Pipes Anchors  CPVC Pipes  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Pipeline Heating Equipment  Piping Accessories  Plastic Pipes  PP Pipes  PTFE Rods  PVC Pipes  PVDF Pipes  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

Related Tenders: Anchors  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Piping Accessories  PTFE Rods  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

Avance Gas Holding Ltd Reports Unaudited Results for the Third Quarter of 2021
Sale of 3 Wind Farms in Lithuania with Total Capacity of 185.5 MW Completed
Kratos Receives Initial Production Order for Affordable, High Performance Jet Engines
Ferroglobe Makes Operational Adjustments in Spain to Address Rising Energy Costs
Production

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us