Overhauling of Berth No.6 Crude Oil System
Reference: TP-221305-B 3/28/2022, Location: Africa
Category: Maintenance and Repair
Scope of Work
The company announces its need for Overhauling of Berth No.6 Crude Oil System.
The Project is an Engineering Procurement Project (Turnkey Project) to Overhauling of Berth (Buoy) No. 6 to export Crude Oil, Marsa El Brega, Libya
The scope of this project will include but not limited to: Detail Engineering, Pre-inspection, Underwater Inspection, Dismantling, Overhauling, Re-installation of Main Buoy, Subsea Hoses, Anchoring Chains, Floating Hoses, Mooring system, Procurement of Materials (other than company supplied materials), Replacement of Anodes, Hydro Testing of Floating Hoses, Subsea/ Floating Hose Strings Re-Installation, Sand Blasting and Painting, as mentioned in the Scope of Work and Drawings attached on CD.
|