Provision of Replacement Service for the Outlet Pipeline of Water Injection Manifold
Reference: 005/SC/22 11/18/2022, Location: Middle East
Category: Manifold

Scope of Work
The company announces its need for Provision of Replacement Service for the Outlet Pipeline of Water Injection Manifold. Replace existed water injection pipes with new water injection pipes (the CONTRACTOR shall provide the new 18” water injection pipelines are SMLS API5L PSL2X60 3PE, 18” ×17.48mm, total require about 115m; the new 16” water injection pipelines are SMLS API5L PSL2X60 3PE, 16” ×15.88mm, total require about 45m).



Related Prooducts: Manifold Flanges  Forged Steel  Gaskets  General  High Pressure Connection  Iron Fittings  Lined Fittings  Manhole covers/ grates  Manifold  Plastic Fittings  Stainless Steel Fittings  Steel Fittings  Welding Fitting 

Related Tenders: Flanges  Gaskets  General  High Pressure Connection  Lined Fittings  Manifold  Stainless Steel Fittings  Steel Fittings  Welding Fitting 

Lamprell Signs New Debt Facility
Injazat & Lamprell Joint Venture Appoints Chief Executive
Preferred Supplier on Major Renewables Project
Lamprell plc: Limited Notice to Proceed Pending Contract Award
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us