Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

EPC Of New 12’’ Low Pressure Gas Loop From Stn.2 To Stn.4
Reference: 15 /2022 8/17/2022, Location: Africa
Category: Engineering Procurement and Construction (EPC)

Scope of Work
The company announces its need for EPC Of New 12’’ Low Pressure Gas Loop From Stn.2 To Stn.4. The work involves the implementation, installation and procurement the material required for replacing and connecting the new 12 inch line of the low pressure gas loop between station 4 and station 2 at Amal Field, including detailed Engineering , civil and mechanical works required for the completion of the projects, such as pipe assembly, trenching, welding, pipe laying, testing, pipe inspection, Finish the installation of the pipe and its accessories according to the drawings and specifications in the scope of work.



Related Prooducts: Engineering Procurement and Construction (EPC) Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Tenders: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

SLPE Awarded Inch Cape WTG Foundation Detailed Design Contract
Christening Ceremony COS Master
Marine License Milestone for Seagreen 1A
World’s First Offshore Hydrogen Storage Concept Developed by Tractebel
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us