Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Fiber Optic Cable Trenching & Installation Works for the Jabal Alkhier Cable Routs
Reference: 8/ 2022 7/24/2202, Location: Africa
Category: Cables

Scope of Work
The company announces its need for Fiber Optic cable Trenching & Installation Works for the Jabal Alkhier Cable Routs. The Optical Fiber Project is about 66 km long, and shall include all the works covering the excavation of trench segments, laying of fiber optic cables, construction of cable protection, installation of cable marking tapes and cable markers, backfilling, (as per details mentioned in the scope of work).




Related Prooducts: Cables Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

World’s First Offshore Hydrogen Storage Concept Developed by Tractebel
WinGD Expands Engine Technology Investment with Global Test Centre
Capital Product Partners Announces Completion of Six LNG Carriers
Minerva Gas Joins Maersk Mc-Kinney Center for Zero Carbon Shipping

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us