|
|
|
Upgrade of HFO Heater Honeywell Obsolete PLC & SCADA in RLIC
Reference: LT22107000 10/10/2022, Location: Middle East
Category: SCADA Systems
Scope of Work
The company invites all prospective suppliers and contractors for Upgrade of Control Systems for Heater, shutdown system of BMS 1&2 and HFO Export Pump of HFO Plant in Ras Laffan Industry City.
Contractor to carry out the Engineering, Design, Procurement, Installation and Commissioning to upgraded following obsolete systems at HFO facility in Ras Laffan: (a) Honeywell PLC and SCADA Control Systems (b) Shutdown system of existing obsolete Honeywell BMS 1 & 2 and (c) HFO Export pump control panel with a Contract Duration of 8 month which includes 1 month mobilization period.
|
Related Prooducts: SCADA Systems
Analyzers, Gas
Calibration Equipment
Calibrators, Electronic, Pneumatic
Concentration
Conductivity Meters
Density
Detector, Gas
Dissolved Oxygen meters
Drilling Instruments
Float Switch
Gas meters
General
Indicators and Recorders
Leak Locators
Level meters
Liquid Measurement
Load cells
Monitoring & Control
Mud Control
Mud Logging
pH and REDOX
Pressure gauges/ Transmitters
Radiation Detection
SCADA Systems
Temperature gauges/ Transmitters
Thermocouples
Thermowells
Transducers
Transmitters
Transmitters, Pressure
Turbidity Meters
Viscosity
Weather Station
Weighing Equipment
Related Tenders:
Analyzers, Gas
Calibration Equipment
Calibrators, Electronic, Pneumatic
Conductivity Meters
Density
Detector, Gas
Dissolved Oxygen meters
Drilling Instruments
Gas meters
General
Indicators and Recorders
Leak Locators
Level meters
Liquid Measurement
Monitoring & Control
Mud Logging
Pressure gauges/ Transmitters
SCADA Systems
Temperature gauges/ Transmitters
Thermocouples
Thermowells
Transmitters
Transmitters, Pressure
Viscosity
Weather Station
|
|
|
|