Replacement of GLRU Cooling Water Return Line 36 inch
Reference: 27/2022 12/15/2022, Location: Africa
Category: Maintenance and Repair
Scope of Work
The company announces its need for Replacement of GLRU Cooling water Return Line 36 inch. The Objective of this project is to replace the GLRU 36’ A2-502 underground cooling water return line at the L.N.G. Plant. A new line to be installed with five inspection pits and new corrosion equipment. (P.C. Contract) (As per details mentioned in the scope of work).
|