Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Upgrading of Cathodic Protection System
Reference: 26/2022 12/15/2022, Location: Africa
Category: Cathodic Protection

Scope of Work
The company announces its need for Upgrading of Cathodic Protection System (36” Gas Pipeline, Gas Plant and Slug Catcher Piping Facilities). The Objective of this project is to Upgrade the cathodic protection system of 36’ gas pipeline, gas plant and slug catcher piping facilities. (As per details mentioned in the scope of work).




Related Prooducts: Cathodic Protection Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Fluor Raises 2021 Guidance and Reports Third Quarter 2021 Results
Fluor-Backed NuScale Power Signs Agreement to Accelerate Small Modular Reactor Commercialization
Fluor Extends & Expands Credit Facility and Links Borrowing Costs to Future ESG
Fluor Reports Fourth Quarter and Full Year 2021 Results

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us