New Flare Stacks at the Gas Plant
Reference: 25/2022 Re 11/20/2022, Location: Africa
Category: Maintenance and Repair
Scope of Work
The company announces its need for New Flare Stacks at the Gas Plant. The Objective of this project is to replace six old flare stacks with two new double stacks (Two flare stacks of 36 inch and two flare stacks of 20 inch) and modify the flare header of about 700 meters. (As per details mentioned in the scope of work).
|