Replacement of 3.3Kv Ring Network Cable and Substation A,B,C & X
Reference: MTC-39/2022  1/10/2023, Location: Africa
Category: Cables

Scope of Work
The company announces its need to Replace the Existing Cable 3Cx120mm² " 3.3kv " Ring Network Cable From the Power House Switch Board No.1 To Substations A , B & C At GC1 & Replace the power cable from Substations " C " to Substations " X " at Camp Area Sarir Field.

The main work shall consist of but be limited to the Following:
- Cable trench excavation and backfilling.
- Installation of new cables, cable jointing and termination work.
- Replace & upgrade the 3.3kv Substation A, B, C & X. With the latest Technology.
- Contractor shall replace old Power Transformer 500KVA at substation "X” With New power Transformer 750KVA.
- Check, test and commission the new installation.



Related Prooducts: Cables Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

International Seaways Repurchases Shares
Archaea Energy Announces Results of the Completed Redemption of All Outstanding Public Warrants
Mesa Royalty Trust Announces Trust Income for December 2021
MGE Releases Annual Corporate Responsibility and Sustainability Report
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us