Pipeline Maintenance under Road Crossing on Call off Dukhan Fields Reference: GT23105400 7/17/2023, Location: Middle East Category: Maintenance and Repair
Scope of Work
The company invites all prospective suppliers and contractors for Pipeline Maintenance under Road Crossing on Call off Dukhan Fields. Contractor shall carry out the following WORK on Call-Off basis: (a)Construction of temporary access roads during Road Crossing replacements. (b)Excavation of designated 2" up to 36" RC pipe lines and preparation for inspection. (c)Re-coating of the excavated pipeline after inspection. (d)Replacement of corroded 2" up to 36" road crossing pipe lines as per QP recommendations. (f)Reinstatement of roads after completion of road crossing.