Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Prequalification for Lightning Protection
Reference: PRE-0368-2023 10/16/2023, Location: Middle East
Category: Lighting

Scope of Work
The company announces its need for Prequalification for Lightning Protection. Prequalification for Lightning Protection The lightning protection system shall protect tall structures and buildings against lightning strikes and to alleviate the dangers of fire or explosions of flammable fluids and gases in process areas of the plant. Design, construction details of Lightning Protection System Materials are mentioned in the Specification provided in the pre-qualification tender package.





Related Prooducts: Lighting Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

AHTS Contract Award in Brazil
Solstad Awards Contract for PSVs in UK
Solstad Awards Contract for CSVs
Solstad Announces Sale of Vessels
Production

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us