Replacement of Underground Cooling Water Lines P.C Power Station
Reference: 01/2024 2/20/2024, Location: Africa
Category: Maintenance and Repair
Scope of Work
The company announces its need for Replacement of Underground Cooling Water Lines P.C Power Station.
The work includes Mechanical, Civil jobs and very small quantity of Instrument Job. It involves excavation, removal of old pipes, casting of civil foundation & trenches,
erection of pipe supports, fabrication/installation of new pipes, installation of Flow meter & Temperature Gauge, testing, painting and commissioning of the system.
The location is within the running Power Plant in the Petro Chemical Complex of the
COMPANY, commonly referred to as Industrial Area 2, in Marsa El-Brega. And the
work has to be executed while the plant is running. CONTRACTOR shall take all
safety precautions so that the work is executed without hindering plant operation or
causing any safety hazards to the personnel involved.
|