Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Prequalification for Lighting Fixtures
Reference: PRE-0643-2024 4/4/2024, Location: Middle East
Category: Lighting

Scope of Work
The company announces its need for Provision of Lighting Fixtures. The scope of work for Manufacturer with respect to the Lighting Fixtures shall include but not limited to Design & Engineering, Supplier & Sub Supplier Drawing Review Manufacturing & Testing, Documentation and Drawings. In addition to above mentioned details, Applicant to meet the Bapco Upstream Technical & Financial Criterias, Specifications, site design and data condition attached to the Prequalification documents.




Related Prooducts: Lighting Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Solas Energy Advises on $500M Investment in Renewable Energy Infrastructure
WEC Energy Group Announces Hydrogen Power Pilot Program
Talesun's PV Modules Selected to Power 57 MW Projects in U.S.
Desert Mountain Energy Receives Permit for Next Well
Production

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us