Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of Fittings
Reference: TPC-2070-2024 4/8/2024, Location: Middle East
Category: Fittings

Scope of Work
The company announces its need for Provision Supply of fittings. As mentioned above these materials are required to implement the advance tie in Scope for the Debottlenecking Pipeline project inside the CGDF plant. The objective is modify the facility during the Jan 2025 Turn around, when the plant will be under shut down and make the necessary spool modifications and install the advance tie in valves and spectacle blinds as per the scope indicated in the respective P&ID;s. All pipes fittings, flanges, valves and stud bolt and nuts and gaskets are envisaged to complete the Tie in works as listed in this MTO sheet and are required on site by the end of December 2024.





Related Prooducts: Fittings Flanges  Forged Steel  Gaskets  General  High Pressure Connection  Iron Fittings  Lined Fittings  Manhole covers/ grates  Manifold  Plastic Fittings  Stainless Steel Fittings  Steel Fittings  Welding Fitting 

Related Tenders: Flanges  Gaskets  General  High Pressure Connection  Lined Fittings  Manifold  Stainless Steel Fittings  Steel Fittings  Welding Fitting 

Desert Mountain Energy Receives Permit for Next Well
Yara & Linde Agree to Build 24 MW Green Hydrogen Demonstration Plant
Yara, Temasek, Horizons Ventures & Breakthrough JV in Israeli Green Hydrogen
NYK Delivers Methanol-Fueled Chemical Tanker
Production

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us