Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of Different Valves for Prefabrication Work for LSDP Catalyst Change
Reference: Q71175(88) 4/23/2024, Location: Middle East
Category: Valves

Scope of Work
The company announces its need for Supply of Different Valves for Prefabrication Work for LSDP Catalyst Change. The requested wash water valves are require to do some repairs and major maintenance works at Bapco Refining. The existing wash water pumps has maintenance issues and are not meeting the designed flow and need to be replaced with new pumps. The angled globe valve and gate valve requested are necessary for the piping modification required for the replacement of the old pumps.





Related Prooducts: Valves Air Valves  Ball valves  Butterfly Valves  Check Valves  Christmas Tree/Wellhead Valves  Cone Valves  Control Valves  Diaphragm pilot control valves  Fire certified valves  Fire Hydrant  Gate Valves  General  Globe Valves  HP Butterfly Valves  IRIS Control valves  Knife Gate Valves  Metal Diaphragm Valves  Needle Valves  Pinch Tube Valves  Piston Pilot control valves  Piston Valves  Plastic Diaphragm Valves  Plastic Valves  Plug Valves  Pressure Relief Valves  Safety Valves  Sight Glass  Solenoid Valves  Steam Traps  Strainer  Valve Actuators  Valve Limit Switch  Valve Positioner 

Related Tenders: Ball valves  Butterfly Valves  Check Valves  Christmas Tree/Wellhead Valves  Control Valves  Gate Valves  General  Globe Valves  Plug Valves  Pressure Relief Valves  Safety Valves  Solenoid Valves  Steam Traps  Valve Actuators  Valve Positioner 

Borr Drilling Provides Update on Equity Issuance Settlement
Borr Drilling Limited Announces Increase in Share Capital
Borr Drilling Limited Completed Conditions for Equity Raise
Borr Drilling Limited Changes to the Board of Directors
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us