Supply of 24 and 32 inch pipes
Reference: TP-1180-2024 5/5/2024, Location: Middle East
Category: Pipes
Scope of Work
The company announces its need for Supply of 24 and 32 inch pipes required for the regasified liquid natural gas project (RLNG). The company aims to lay 2 x 24 inch pipelines of regasified liquid natural gas (RLNG) between Alba Gas Station Jump Over to Al Durr Distribution Point. As part of phase 2 scope, Bapco upstream will be installing above ground 2 x 24 inch pipelines from Asker Valve Station to Hafeera Valve Station and Hafeera Valve Station to Al Durr Distribution point. In addition to the pipeline, a new intermediate valve station – Hafeera Valve station will be constructed as part of phase 2 scope.
|