Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of Vane
Reference: TPC-2119-2024 7/8/2024, Location: Middle East
Category: Manifold

Scope of Work
The company announces its need for Supply of Vane. In Oil facility Well Manifold are separating Oil, Water and Gas from crude oil. These Turbulator Pack Vanes are used for Oil Facility Well manifold as an internal of Bulk Gas Oil Separator which is essential for operation. Hence, we need to maintain Min Max level all the time for routine breakdown and Planned Turnaround and Inspection.





Related Prooducts: Manifold Flanges  Forged Steel  Gaskets  General  High Pressure Connection  Iron Fittings  Lined Fittings  Manhole covers/ grates  Manifold  Plastic Fittings  Stainless Steel Fittings  Steel Fittings  Welding Fitting 

Related Tenders: Flanges  Gaskets  General  High Pressure Connection  Lined Fittings  Manifold  Stainless Steel Fittings  Steel Fittings  Welding Fitting 

TotalEnergies & RDB Sign MoU for the Energy Sector Development
TotalEnergies Sells Minority Interests in West of Shetland Fields
TotalEnergies Makes Significant Discovery in Offshore Block 2913B
Indicative ex-Dividend Dates for 2023 Dividend
Production

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us