Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of Line Pipe
Reference: TP-1206-2024 8/7/2024, Location: Middle East
Category: Pipe Lining, coating & insulation

Scope of Work
The company announces its need for Supply of Line Pipe required for the new NCF04, 6 and 7 for the NAG Compression Facilities and Khuff Wells which will be installed in Bapco Upstream in the upcoming years .


Related Prooducts: Pipe Lining, coating & insulation Anchors  CPVC Pipes  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Pipeline Heating Equipment  Piping Accessories  Plastic Pipes  PP Pipes  PTFE Rods  PVC Pipes  PVDF Pipes  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

Related Tenders: Anchors  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Piping Accessories  PTFE Rods  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

Eni Announces Start of Collaboration with Holcim to Develop for CO2 Utilisation
Shareholders of Vår Energi Announce Terms of the Initial Public Offering
Guido Brusco Appointed Director General, Natural Resources
LANXESS and Matrìca to Produce Sustainable Preservatives from Renewable Raw Materials
Production

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us