Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of Casing Vapor Recovery (CVR)
Reference: TP-1242-2024 1/16/2025, Location: Middle East
Category: Casing, Tubing & Drill Pipes

Scope of Work
The company announces its need for Supply of Casing Vapor Recovery (CVR) program where a total of 274 beam pump unit wells are connected to a designated network located in the center of the Bahrain oil field. This network has a compression of 12.4 MMSCFD by using 6 compressors located at TB07 and TB08. The intention of the next phase in this program is to increase the network capacity by another 6 MMSCFD through the procurement and installation of two sliding vane compressors to be installed at WM30, while also expanding the network to the south and hooking up an additional 75 wells in the process. The expected production gain at hook up is approximately 568 Barrels of Oil Per Day (BOPD).





Related Prooducts: Casing, Tubing & Drill Pipes Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems  Lubricating Equipment 

Related Tenders: Blowout Preventers Ram, Rotary, Spherical & Annular  Casing, Tubing & Drill Pipes  Coiled Tubing  Drill Bits and Cutters  Extraction Equipment  General  Handling Tools  Hoisting Systems 

Angus Energy: Proposed Placing to Raise up to £1,400,000
Angus Energy Granted Saltfleetby Planning Permission
Angus Energy Provides Update on Saltfleetby Gas Field and Brockham Oil Field Permits
Angus Energy Provides Update on Installation Schedule at Saltfleetby
Production

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us