Dehydration & Desalting Unit for Halfaya Field
Reference: BID9278 9/28/2009, Location: Middle East
Category: Process Equipment

Ref. No.: PRJ.09.4056
Issue Date: 28-Sep-2009
Bid Closing Date: 25-Oct-2009
Offer Validity: (120) days from the Bid Closing Date
Fee: 1000 USD
Bid Bond: 1% From the total value of tender price
Bond Validity: (90) days from the Bid Closing Date

Scope of Work:
The scope of work covers design, detailed engineering, procurement of equipment and materials, delivery of equipment and materials, CIP Missan supervision of installation and technical assistance during field construction, erection, testing and commissioning of one crude oil dehydration desalting train located at station in Halfaya. The unit shall be designed for 50000 b/d dry crude basis.

Scope of work also include details of design vessels fabrication drawing and hook up drawing, ISO metrics drawing, construction and commissioning procedures.

The scope of supply shall be itemized as follow:

1- Dehydration/desalting units including:
# 1 dehydrator with degasser.
# 2 desalter.
# 1 coalacer (or suitable deoiler).
# 1 sump system.

2- Pumping skid:
# 2 fresh water pump skid (1w +1 s).
# 2 recycle water pump skid (1w + 1 s).
# 2 effluent water injection pumps (1w +1s).
# 2 oil charge pumps (1 w+1 s): capacity 500 m3/h each, operating discharge pressure 5 kg /cm2.

3- # 3 set indirect water path heaters skid complete with all accessories.

4- # 1 control system includes: remote control panel (CCP), local control panel (LCP), control cables with all accessories.

5- Chemical injection skids: # 2 Demulsifier injection package, # 2 anti corrosion, # 2 anti scalar.

6- # 1 air compressed system (screw type) to be included: # 2 compressor skid screw type electrical driven (1w+1s), # 1 compressor skid screw type diesel engine driven, air dryer skid, air receiver.

7- Electrical for DEH. /DES. units include: # 1 PMCC, cable line system, # 1 lighting system, # 1 ear thing system.

8- # 9 power units.

9- Electrode assembly include: # 9 H.P.bushing assembly, # 9 H.V. assembly, # 3 electrode insulator assembly.

10- # 3 set field control panel.

11- # 1 set interconnecting piping, fitting, and valves for all vessels and equipments.

12- # 1 set spare parts for two years.



Related Prooducts: Process Equipment Adsorption Equipment & Materials  Aerators  Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Clarifiers  Condensers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Mixers, Static  Nozzles/Diffusers  Steam Generators  Ventilators 

Related Tenders: Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Steam Generators 

Caspian Oil Mobilizes Drill Rig to East Mailisu
Russia September Oil Output Hits Record 10 mln bpd
NEP Acquires Oil Drilling and Services Company
Chevron Kazakh Venture to Raise Oil Output
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us