Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Design and Build of Um Al Aish LPG Filling Plant
Reference: BID9581 10/25/2009, Location: Middle East
Category: Gas Processing

Ref. No.: LPG / PROJ - 01 / 2009
Issue Date: 25-Oct-2009
Pre-Tender Meeting Date: 18-Nov-2009 shall take place at KOTC headquarter.
Original Bid Closing Date: 25-Jan-2010
Extended Bid Closing Date: 02-Mar-2010
Fee: 3000 Kuwaiti Dinars.
Bid Bond: KD 776000
Bond Validity: (90) days from the Bid Closing Date

Scope of Work:
The scope comprises the construction of a new filling plant at Um Al Aish area (North of Kuwait), which includes the construction of 6 LPG mounded vessels, LPG pumping station, truck loading, cylinders filling centers, administration buildings and associated work shops.

The site is to be located to the North of Kuwait city, in the area called Um Al Aish. The size of the LPG filling plant is 500m by 300m (equivalent to 150,000m2 or 15ha).



Related Prooducts: Gas Processing Deodorization system  Gas dehydration  Gas sweetening  Gas Treating  General  GTL Processing  LNG Processing  LPG Domestic use  LPG Odorless  Packing  Phase Separation  Scrubbers 

Related Tenders: Gas dehydration  Gas sweetening  Gas Treating  General  LNG Processing  LPG Domestic use  Packing  Phase Separation  Scrubbers 

Tunisia to Export Gas to Italy from 2012
Nido to Begin Kawayan 3D Seismic Survey Underway in SC 63
Victoria Announces Drilling Report for Snatcher-3 Pel 111
Hardy Oil & Gas to Commence Drilling in KGV-D3-R1
Tankers

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us