EPIC of Concrete Wall, Shelters & Other Facilities
Reference: BID9770 11/16/2009, Location: Middle East
Category: Civil Works

Ref. No.: General Tender # GT09113800
Bid Bond: QAR 500,000
Fee: QAR 500
Issue Date: 16-Nov-2009
Original Bid Closing Date: 03-Jan-2010
Extended Bid Closing Date: 17-Jan-2010, 31-Jan-2010
New Bid Closing Date: 14-Feb-2010, 11:00 hrs Local (GMT +0300)
Offer Validity: 14-Jun-2010 - (120) days from the Bid Closing Date
Bond Validity: 13-Jul-2010 - (150) days from the Bid Closing Date
Location: Contracts Dept., Operations Division, Qatar Petroleum, PO Box 3212, PO Box 3212, Royal Plaza, G Wing, 4th Floor Rm G13, Doha.

Scope of Work:
QP Dukhan operations requires the services of a qualified and experienced contractor to perform EPIC of the following works at various stations within Dukhan fields:

1- Reinforced concrete pre-cast wall
2- Shelters for Nitrogen tankers and cars
3- Recovered oil sump pit
4- Closed drain pits
5- Chemical stores
6- Safety showers
7- Repairing of existing cellars inclusive miscellaneous works such as asphalt paving, aggregate spreading gates, fence, interlock tiles and netting.



Related Prooducts: Civil Works General 

Related Tenders: General 

Praxair Operates Hydrogen & Nitrogen System
Zambia Selects Firms to Explore For Oil
AWE’s Trefoil-2 Drilling Reached a Total Depth of 3,235m
Caspian Oil Good Oil Shows in Mailisu III Well #6
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us